Yes, within limits. Dolibarr ships a Bill of Materials module and a Manufacturing Orders module in its standard distribution, and together they cover the basic make-to-stock cycle of a small workshop. What they do not include is routing with per-operation times, capacity planning for work centres, or a shop-floor screen for operators — the parts that usually push a team toward add-ons or integration.

What Dolibarr includes for manufacturing

Both modules are already in the distribution. Nothing to install: you activate them in Home > Setup > Modules. Manufacturing Orders depends on Bill Of Materials, so BOM has to be enabled first.

Bill of Materials: the recipe behind a product

A BOM describes one finished product. It records the quantity that BOM produces, the estimated duration, the production warehouse, and the component lines with their quantities. Cost is not typed by hand: the BOM adds up the cost of its lines, materials and services included. If the Workstation module is active, a line can also point to a work centre, so time spent there is recorded against that workstation.

BOMs can be multi-level. A component line can point to another BOM, and the requirements calculation walks through each level. That matters as soon as a subassembly is built in-house instead of purchased.

Manufacturing Orders: the instruction to produce

An MO turns a BOM into stock. You create it from a BOM, with the components pre-filled, or build it manually, then validate it. From the Production tab you record output in one of two ways: "Consume and produce" for manual quantities, or "Consume and produce all" when the full quantities were used. Each entry creates stock movements linked to that MO, and the order reaches the Manufactured status only when all quantities have been consumed and produced. Partial runs are allowed, so the same order can be produced in several stages.

Two details matter in daily use. Virtual stock already accounts for open MOs, so you see what is committed. And if the Lots/Serial module is on, batch-managed products require a lot number at production time, which gives traceability from production through to shipment.

One manufacturing order, step by step

The flow is short: one order, a set of components, and stock movements on every entry. It runs like this.

  1. Open the BOM and check the components, the production warehouse and the estimated duration.
  2. Create the MO from that BOM, or enter it manually if the product has no BOM.
  3. Set the quantity to produce and validate the order.
  4. In the Production tab, consume the components and declare the output. Use "Consume and produce all" for a complete run, or "Consume and produce" to record partial quantities.
  5. Repeat step 4 for further stages if the order runs in several batches.
  6. The MO becomes Manufactured once every quantity is consumed and produced, with stock movements tied to the order throughout.

There is no approval step for quality, no operator clock-in screen and no picking list to hand to the warehouse. Those gaps are what the next section covers.

Where the core stops

The core covers the recipe and the production order, then stops at the shop floor. The table below separates what the built-in modules do from what they leave to someone else.

Need In the core
Product recipe with components and cost Yes, BOM
Multi-level assemblies Yes
Production order with stock movements Yes, MO
Routing with times per operation No
Work-centre capacity and scheduling No
Shop-floor terminal for operators No
Picking list per BOM line No

Workstation deserves a separate note. The module has been stable since Dolibarr 19 and it does what it says: it lets a BOM line point to a workstation so that time is imputed to the product. It is not a scheduler. There is no sequence of operations, no capacity per centre and no load levelling.

Planning has the same shape. Virtual stock looks at open MOs, but the core does not run a dated requirements calculation — no "order this component by this date because that MO starts then". Forum threads from users ask for a per-line BOM warehouse and a printable picking list; neither is in the core today.

For routing, work centres, quality control and full industrial costing, the ecosystem sells add-on modules. Evaluate them as separate products, with their own support and upgrade path.

Connecting the workshop to the rest

The REST API is the usual route. If the plan is to keep Dolibarr as the ERP and place a MES, a scheduler or a shop-floor tool beside it, orders, stock and products can be read and written from an external system. Our article on connecting Dolibarr over the REST API shows what that looks like in practice.

How to decide

One question settles it: does the work fit the BOM-to-MO cycle, or does it need scheduling? A workshop building a limited set of products to stock, where the weekly plan lives in a spreadsheet, will find the core covers the recording and stock side well. A plant that must sequence operations across work centres, capture operator time at the machine or run inspection steps needs more than the core provides, and should budget for it before go-live.

Two quick checks usually decide it in a small workshop. If BOMs change far less often than the weekly plan, the recipe side is stable and the core will hold. If stock accuracy matters more than labour costing, the MO flow with its stock movements gives you what you need without a scheduler.

Our decision guide (in Spanish) walks through ten signals to check before choosing Dolibarr. If you want the modules configured around your production flow, our page on Dolibarr ERP integration services describes deployment, custom modules, data migration and team training by EasySoft Tech S.L.